The ditches are dug, waiting for the plumber. The whole house is cleared out so that the insulation dudes can do their foamy stuff. All the stuff from in the house is under a heavy duty 16X20 tarp in the yard.
I'm beat.
At some point I'll get to fill the ditches, soon we start drywalling and I"ll have to start on the pump/power house.
I'm thinking we get to rest sometime near the end of September.
No comments:
Post a Comment