And the new building pad :)
This is a bit of a milestone in the project. It took upwards of 3 weeks to get the propane tank and underground lines all moved outta the way and the site prepped. The concrete went down in less than 4 hours. Above are the local fellas I hired to give me a hand. And here's the pad, with the bolts in place for the 10 X 23 foot building addition for storage and the post anchors for the covered storage (no walls since you can't have an enclosed building within 10 feet of the propane tank. :D And we're all about the safety. Now to get the wood ordered and put that sucker up!